Saturday, February 28, 2015
Saturday, February 21, 2015
Rotary #99200 | 2 Comments - Click Here :
Mike Trent - With all the weather mayhem crippling a good part of the country this weekend, it seemed appropriate to get out the rotary for the first time this year. This On3 model was built in 1986 using the frame, cowling, wheel, and trucks from a Durango Press RGS Rotary #02. I used both the C&S Folio for #99200 and the plans and a few parts like the scribbed siding and some other odds and ends from the kit. After a long and meandering journey through the wilderness, it turned out pretty well.
During construction, I scoured every photograph I could find, and that anyone else could find for details, and discussed various aspects of how various things were, how they appeared, and could have or should have been built and maybe were over Saturday breakfasts with my barnyard friends at JJ McCabe's in Boulder for months. Sadly, one of the most valuable resources for this project were a couple of photographs taken the day after the 1935 roundhouse fire which burned off the wood body that appear in the Pictorial Supplement. In the end, like #537, I pretty much went through it making every effort to duplicate what I could find or see in photographs.
Within a week of finishing it prior to the 1986 Narrow Gauge Convention, Todd Hackett, with whom I had commiserated on too many aspects of this to be counted, found a rare 3/4 rear view of the rotary heading out of Como on a run to Boreas, and that photo showed that the cover over the coal bunker was actually slightly peaked. In every angle and view we had seen and studied before that, we had been convinced that it was flat. Oh, well. So, Darel, take note!
Many helped with various things along the way. Old Doug Schnarbush's contribution was that he told me that the interior of the cowling and wheel were not painted, rather they just gooped up graphite and oil in there because snow and ice wouldn't stick to it.
The tender wrapper is from one of the PSC tender kits that were available at that time, similar to one I used on #537, and also on my new #73. which I bought on ebay without a tender. All three of the wrappers are different lengths, and all are very close to what each needed. The PSC tender kits do appear on ebay, so if anyone is looking to build one of these in 1/4" scale, keep your eyes peeled for them.
And here is my first attempt to Photoshop anything like a winter scene here at Dickey. On occasion, the rotary was run on the passenger train, as is seen here leaving Dickey to plow up into heavy snow at Dillon. Afterward, the train backed down to Dickey and headed off into the teeth of the storm toward Leadville. Train No.70 Rotary 99200, #75, #6.
Mike Trent
Saturday, February 14, 2015
Roper's Snapshot Saturday No.35 | 10 Comments - Click Here :
![]() |
Carol Weiss Photo 8-'42, Derrell Poole Collection.
|
![]() |
| Carol Weiss Photo 8-'42, Derrell Poole Collection. |
![]() |
| Carol Weiss Photo 8-'42, Derrell Poole Collection. |
![]() |
| Carol Weiss Photo 8-'42, Derrell Poole Collection. |
![]() |
| Carol Weiss Photo 8-'42, Derrell Poole Collection. |
![]() |
| Carol Weiss Photo 8-'42, Derrell Poole Collection. |
Saturday, February 7, 2015
Saturday, January 31, 2015
Sunday, January 25, 2015
The Blog: Three Years Later | 9 Comments - Click Here :
| Roper Then |
| Roper Now |
Darel Leedy - This week marks the third anniversary of the C&Sn3 blog. I originally started this blog as a means to motivate myself by documenting the construction of a small Sn3 layout. My first post (The UK Influence), described my reasoning and plans for a layout depicting Dickey, Colorado circa 1920.
As my progress slowed and I had less and less to write about, I invited fellow C&S modelers working in any scale to also post on the blog (my brother Derrell and I think there might be 5 of us in Sn3!). I've continually updated and modified the blog to be something I thought was missing; a place for C&S modelers and historians to congregate and share information.
The blog (a free online magazine?) will likely hit 100,000 total views this
month (80,000 since opening it to additional authors less than a year ago!), and the new
discussion forum has over 8500 views in less than a month. Again, their success depends on your participation. I am very
appreciative of those that have contributed a blog article: Derrell Poole, Keith Hayes,
Doug Heitkamp, Robert Boorman, David Steers, Bill Meredith, Lincoln Pinn, Randy
Rieck, Don Peterson, Rick Steele and Mike McKenzie. And to all of those participating in the discussion forum; Thank you!
Along the way, my miniature Australian Shepard; Roper, joined us and shared his uncanny knack for finding and sharing old photographs. He especially loves to be thrown a bone now and then.
![]() |
| Stay Thirsty My Friends |
I am always open for suggestions. So if you think something is missing or could be improved, please let me know. And if you would like to join the fun with your own blog post, just drop me a note. And don't forget to join us in the C&Sn3 Discussion Forum. I swear, of late more new information has been shared there than anywhere else. Enjoy!
~ Cowboy Up!
Friday, January 23, 2015
Monday, January 19, 2015
A Tale of Three Class 60's | 3 Comments - Click Here :
| #19 |
Bill Meredith - Greetings All! I thought there may be interest in this job I
am doing for a good client of mine in the group. While the RGS did not make it
to Leadville to interchange with the C&S, it is Sn3 and the lessons learned here may be of some use to
someone.
The requirements called for three RGS, former D&RG,
Class 60 C-16s numbers 3, 12, and 19. The plan was to source two of the locos
from existing Railmaster kits which Mr. Poole had made huge and excellent
progress on but had to divert to other more pressing jobs. The third was built
from castings and nickel silver etchings that I had developed.
The #19 was built up from the nickel silver etchings and an
assortment of brass castings. These castings came from PSC, Tomalco, and from
castings that I had developed for projects such as these. The drive comprises
of a Faulhaber 1724 coreless motor and a NWSL 36:1 gearbox. I have found this
arrangement to be optimal as the Faulhaber tops out at 8,000 RPM at a full
12VDC but with 3x the torque of similarly sized motors. Most can type motors at
this size crank at 12,000-15,000 RPM and I wanted a more realistically slower
top speed. We were good to go.
The drivers were built in house using my center castings and
stainless steel rims. The tender trucks are an old pair of Tomalco trucks
pulled from the parts bin.
Now Derrell had done the lion’s share of work on one of the
Railmasters and the other had really only the tender completed. So I completed
this loco as best as I could. I ended up replacing the airpump with an 8”
airpump from my collection, the headlight from PSC. The running boards were
replaced with nickel silver ones from my scrap box. The rest was stock from the
kit. The Railmaster castings are at best ok. Best not to look at them too
closely in other words. When they are assembled and painted, a Railmaster can
be hard to distinguish from a brass import. The model was plumbed as best as
possible and as closely to prototype as possible but as you might imagine,
decent photos from that era (ca. 1905) are pretty slim. So we make do.
Derrell has a pretty good handle on soldering white metal to white metal. It can be done, but a good 60W soldering iron and experimentation is the order of the day. When I say “a good 60W iron” you need to have one with a fairly large tip that can throw off a lot of heat. That is, the white metal will suck a lot of heat from the iron’s tip. The white metal also has a very narrow heating zone between the melting temp of the solder and the melting point of the component you are trying to join. If you are not careful, the part will melt away into a frustrating blob of a mess.
| #12 |
Derrell has a pretty good handle on soldering white metal to white metal. It can be done, but a good 60W soldering iron and experimentation is the order of the day. When I say “a good 60W iron” you need to have one with a fairly large tip that can throw off a lot of heat. That is, the white metal will suck a lot of heat from the iron’s tip. The white metal also has a very narrow heating zone between the melting temp of the solder and the melting point of the component you are trying to join. If you are not careful, the part will melt away into a frustrating blob of a mess.
| #12 |
The biggest challenge, and one of arguably the most sensitive components, was joining the running boards to the boiler. Given the weight of the loco and the fact that most of us will pick up the loco via the running boards, it’s imperative to insure as solid a bond as possible. This took some work.
The all Railmaster loco is to become RGS #12. The pix show
the locos almost ready for paint preparation so if the loco seems a little
unfinished, it’s because several of the components were placed for the purposes
of some quick and dirty photos.
| #3 |
When I started RGS #3, the idea was to build it up as the
#12 was built using mostly Railmaster components. After some effort, I canned
that idea and went with using an etched nickel silver boiler, smokebox, and cab
that I had in the spare parts bin.
Nickel silver is a truly wonderful material to work with
that has some very interesting properties. Unlike brass which allows the heat
to travel through the material when soldering, nickel silver dissipates heat
almost immediately. This means that it heats up and cools quickly. It is now
very easy to solder parts together while holding them with your fingers. How
slick is that? A simple temp controlled soldering iron is more than ample for
the large components and the smaller castings. A resistance soldering unit is
required for attaching the large brass castings as usual.
The nickel silver etchings also provide a greater level of
crispness to the model. This is apparent in the paneled cab sides and the rivet
detail. For the domes, the Railmaster domes were epoxied in place and the stack
was the Railmaster part but drilled out and secured using a 00-90 machine
screw.
Other details on the #3 include a PSC headlight, brake
cylinders and levers, injectors, throttle, Johnson bar, steam turret, and brake
valve. The parts from my custom parts bin include the cab support, 8” airpump,
and smokebox front.
The remaining white metal castings will go on to a better
and more useful existence in that I will be melting them into boiler weights
and any traces of these kits will be removed from the workshop environment.
| #3 |
While there are a few more components to add to the 3 and
12, they are mostly done and the plan is to complete them over the next couple
of days. After which the paint prep, sandblasting, and cleaning shall commence.
The owner has very specific requirements for the finish that will result in
three very striking models. The models will be painted with Scalecoat Black and
the boiler jacket will be painted a non-blue shade of American Iron that is
similar to polished burnt iron. No blue tint, but rather a grayish metallic
finish. Lettering is aluminum leaf. All three locos will be equipped with
Tsunami DCC and sound with Current Keepers to sustain operation over
questionable track. But of course as I look at the models now, I see several
more details that need to be added…
there is always something!
That wraps things up for now. If there is interest, I will
post some pix of the finished locos prior to delivery. If anyone has any
questions, please fire away.
Bill Meredith
Saturday, January 17, 2015
Thursday, January 15, 2015
Operating Leadville | 7 Comments - Click Here :
![]() |
| Boomer Engineer/Conductor Darel Leedy drags a cut of coal cars through Leadville. |
Keith Hayes - About once or twice a year, I try to invite Darel over to operate Leadville. I have made some progress on the layout and it had been a while since he has seen the it. Plus, we had some catching up to do. Plans were made and he came over early in January. Of course it snowed, as it always snows when Darel visits.
In order to prep for the visit, I cleaned all the track and
ran the locomotives back and forth to find last minute shorts and track issues.
Naturally, everything worked great. At the previous two operating sessions, I
created some short switch lists on scrap paper by hand. For this session, I
took the time to create a more realistic form. I combined the lettering from a
Form 31 found in Klinger’s “C&S High Line Memories and Then Some” with a
Monon Switch List in Koester’s “Realistic Model Railroad Operation.” It was a
great improvement, though I have not seen such a C&S form myself (hint: someone
post some images of C&S paper and rules, please!).
After some catching up, Darel and I got to work. The session
starts with a C&S freight just arriving from Denver, and the D&RGW
local arriving from Salida. Each train has a locomotive and six freight cars,
plus a caboose. On this occasion, the Denver passenger train was spotted on the
C&S Depot track, so no cars could be spotted there. Darel chose the C&S
job, and I reviewed the setout locations with him. And we got to work.
The whole point of building the models and recreating
Leadville is to operate the layout, and Darel is a willing and patient
participant in these ‘shakedown’ sessions. Though C&S 74 was a star
performer after I cleaned the track, it repeatedly stopped. Darel diagnosed
this to the tender wheels, and some added weight helped for a bit, but it looks
like I really need to add some ‘keep alive’ boards to the locomotives. Though I
am not fond of tearing into brass locos, I promise I will throw caution to the
wind and perform a couple installs.
D&RGW 278 was not short free, either. The pony truck must be mounted in a slot, as the assembly appears to slide back in forward moves and the wheel shorts on a couple diverging turnouts. Maybe a little clear film will help?
The first task is assessing the switch list and planning the
moves. Being familiar with the layout is a plus. In my case, I used this
opportunity to switch the Arkansas Valley Smelter. This is a complicated move
as the coal track is on a switchback, requiring some thought staging the new
cars, pulling the empty cars, and spotting the fresh loads.
Consequently, it can take some time to get the first spot completed. It took both Darel and I almost an actual hour between arriving at the terminal and getting our first cars spotted. I think this is attributed more to the length of the sidings and perhaps having about 4-5 too many cars on the layout.
When designing the layout, I tried to balance the number of leading and trailing industries, while deferring to the prototype layout. As we operate, the use of tracks is becoming apparent, and some names are starting to stick. Though the prototype C&S yard had four tracks, I only modeled three: the main, what I am calling the arrival track, and the freight house track.
Having two railroads in Leadville provides an opportunity
for an interchange. In my case, this is a short connection adjacent to the
C&S Depot. If I were doing it again, I would provide four car lengths
between turnouts as a place for set-outs. As it is, transferred cars have to be
spotted either on C&S or D&RGW track. At the start of the session, I
had five C&S coals on the D&RGW track I had to work around. Fortunately
Darel picked these up rather quickly!
This was the first time I had the short stretch of track past
the eastern-most switch at Leadville, so the C&S loco can now run around
trains. This greatly aids the C&S crew in switching, and Darel made good
use of this humble start of mainline during our session.
In fact, he tended to work his train
from the east end of the yard, often moving long cuts of cars back and forth
past the Depot. It was great fun to watch!
If you don’t read Model Railroader, Andy Sperandeo has had a great column, “The Operators.” One of Andy’s most valuable tips is to spot cars just past the clearance point. Sawing back and forth can take a while, and working cuts of cars just past the clearance point saves time. Though at Leadville there are also the numerous street crossings to contend with. As scenery progresses, and operations become more consistent, I will become more militant about keeping the street crossings clear during switching.
After about two hours of operating, we both had most of our
switch lists completed, and had little time left of the clock besides. It was a
fun session and both showed the merits of the plan and areas to attend to.
While I am anxious to start the CaƱon campaign, I also have a number of
maintenance items to attend to, like those pesky ‘stay-alive’ boards. And,
while completing some building signage will aide in identifying industries, I
need to give some thought to labeling tracks on the fascia. The switch lists
worked well: the fact that we were both fully occupied for the better part of
two hours JUST SWITCHING is sobering considering plans to extend the main line
and add a helix to a lower level. How long will it take to do just a little
switching and make the run up the High Line to the pass? There is also now
incentive to get the turntable and roundhouse in place. And backdrops. The list
does not end.
It was great to see Darel, and I had a fine time. Who says
you can't operate on the narrow gauge?
Keith Hayes
Modeling Leadville in Sn3
Subscribe to:
Posts
(
Atom
)


























